Construction of excavation for the Trench up to required level. Disposal of excavation materials arising from the Trench up to 200 m from the Trench. Installation of Trench sheets. Supports, Dewatering for the Trench & Trench sheet supply by the contractor

https://lvbusiness.odoo.com/web/image/product.template/94100/image_1920?unique=25585ef

0.02 0.02 USD 0.02

1.00 E£

Not Available For Sale

    This combination does not exist.

    Terms and Conditions
    30-day money-back guarantee
    Shipping: 2-3 Business Days